 |
 |
| The
following graph provides a pictorial representation of
BD systems that have been installed around the world to
date since the first ‘accidental’ installation
in 1981 (ref. Footprints01 newsletter,
Hans Vesterby’s article, page 5). Four of the original
systems were experimental and are no longer functioning
and one was de-commissioned after a neighboring nourishment
project rendered it redundant. Note that some projects
are made up of more than one BD module. |
| A
summary table providing details on each project can be
pulled down from the following link, BD
Module List.pdf (35Kb, 3 pages). The Footprints newsletter
provides regular feature articles on BD projects. Detailed
reports on specific BD projects are available by request. |
|
|
|